From Drawing To Delivery: Ordering FRP Barriers

Nov 23, 2026

Leave a message

A drawing is usually more useful than a long email when ordering barrier panels. It should show the screen's start and end, any gate, the height changes and the spacing of its posts. One missing return at a corner can change the panel count. Mark the revision clearly before sending it to the factory.

For Hebei Weihan's FRP panels, the available product information includes optional acoustic cotton filling. Ask for a quotation against a panel schedule: size, quantity, colour and whether filling is required. It is also helpful to state who supplies the posts and fixings. When the site is on a bridge, have the engineer review the support and wind load before the order is released.

On arrival, count the packages against that schedule. Open several representative packs and check dimensions, edges and visible surface condition. Photograph a damaged corner with its package label while the shipment is still together. Otherwise it can be difficult later to identify which panel needs replacement.

Keep the approved drawing beside the packing list during installation. If the crew finds a mismatch, the revision number and panel position give both sides a starting point for resolving it. That record is particularly useful when a project is delivered in several batches.

Send Inquiry